The objective of the Al Qatrana Power Project is to strengthen security of energy supply in Jordan in an economically and environmentally sustainable manner. There are four components to the project. The first component of the project is the power station: the power station will use natural gas as the main fuel and distillate fuel oil (DFO) as a back-up. The plant site is about 90 kilometers south

Project Information FAQ

Project Information

5 Q
The project “Al-Qatrana Power” is an infrastructure initiative in the Water Supply and Storage sector, located in Jordan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Al Qatrana Power Project is to strengthen security of energy supply in Jordan in an economically and environmentally sustainable manner. There are four components to the project. The first component of the project is the power station: the power station will use natural gas as the main fuel and distillate fuel oil (DFO) as a back-up. The plant site is about 90 kilometers south of Amman and 250 kilometers north of Aqaba, in the vicinity of Al-Qatrana town. The plant will be of a traditional design with two gas turbines, two heat recovery steam generators (HRSGs), one steam generator (130 MW, supplied by Skoda Power as.), an air-cooled condenser, and other associated equipment and structures. The second component of the project is the electricity connection: the plant will be connected to the power system through a 500-meter long, 132-kilovolt (kV) electrical transmission line. The cost is approximately JD 3.1 million (USD 4.4 million), which will be absorbed by National Electric Power Company (NEPCO). NEPCO will purchase all of the plant's electrical output through a 25-year PPA. The third component of the project is the fuel supply: The project will use natural gas that will be supplied from the high-pressure Arab Gas Transmission Pipeline (AGTP), which carries natural gas from Egypt to Jordan and further on to Syria and passes next to the power plant site. The fourth and the final component of the project is the water supply: water will be supplied by Water Authority of Jordan (WAJ), which will construct and own an approximately two-kilometer long water pipeline from a pumping station on the water main line to the delivery point at the project site at a cost of about JD 100,000 (USD 140,000), paid by the Qatrana Electric Power Company.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data