Al-Rastan Bridge Completion Project
Sector: Bridge • Location: Al-Rastan, Homs, Syria
Source: سانا
The project involves completing the Al-Rastan Bridge on the international highway, including a recently completed road diversion at the entrance to the Cement Bridge in Al-Rastan city, Homs province. The diversion road is 140 meters long and 12 meters wide, with excavation, gravel base layers, and asphalt paving completed within 72 hours.
- Status
- Closed
- Sector
- Bridge, Commercial, Road
- Location
- Al-Rastan, Homs, Syrian Arab Republic
- Updated
- 22 Jul 2026
- Source
- سانا
ConstructChat
Ask ConstructChat about Al-Rastan Bridge Completion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves completing the Al-Rastan Bridge on the international highway, including a recently completed road diversion at the entrance to the Cement Bridge in Al-Rastan city, Homs province. The diversion road is 140 meters long and 12 meters wide, with excavation, gravel base layers, and asphalt paving completed within 72 hours. |
Original sector | Infrastructure |
Location
Country | Syrian Arab Republic |
State | Homs |
City | Al-Rastan |
Source
Source | سانا |
URL |
More Details
Record type | Project |
Sector | Bridge, Commercial, Road |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
