Al-Sanabil 380KV Substation

Sector: Commercial • Location: Saudi Arabia

Source: Hyundai Engineering

Project
Closed

Built hope in the land of desertThe Al-Sanabil substation is located in the outskirts of the western part of Jeddah, the most commercial city in Saudi Arabia. To solve power shortage in the nearby industrial region and downtown, Hyundai E&C newly constructed a substation and remodeled the existing power plant/substation. As an EPC contractor, Hyundai E&C performed design, material supply, construc

Project Information FAQ

Project Information

5 Q
The project “Al-Sanabil 380KV Substation” is an infrastructure initiative in the Commercial sector, located in Saudi Arabia. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Built hope in the land of desertThe Al-Sanabil substation is located in the outskirts of the western part of Jeddah, the most commercial city in Saudi Arabia. To solve power shortage in the nearby industrial region and downtown, Hyundai E&C newly constructed a substation and remodeled the existing power plant/substation. As an EPC contractor, Hyundai E&C performed design, material supply, construction, and test run. Unlike other substation constructions, the project applied the gas-insulated bus duct technology in connecting a transformer and GIS to improve system stability and constructional efficiency. The existing cable connection method always required a tunnel work to ground cables. With this technology, the interruption between processes were reduced without tunnel work by connecting a cable to the ground through a conductor. Simultaneously, the new method made a big contribution in achieving accident-free in all processes by improving the construction quality. Moreover, the methodology demonstrated its excellence in maintenance. It was also easy to secure material and construct and take swift measure in the occurrence of issue, so the technology had a big advantage in terms of the operation of substation.  Built a city free of blackout issueThe Jeddah area suffered from unstable power supply and frequent blackout every year due to lack of power-related facilities with increasing power consumption because of rapid economic development and population growth. However, since the completion of the substation, the area was able to receive the power from the Shuaiba II power plant 150km away from the region. Accordingly, the blackout issue was resolved in the majority of the residential area and industrial complex.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data