logo

Alabama Power Gorgas Battery Facility

Sector: Power Generation (CCGT) • Location: Alabama, United States

Source: Hart Energy

Project
Planned

Alabama Power plans to develop a 150-MW utility-scale battery energy storage system on the site of a former coal-fired power plant. Construction is expected to begin this year and be completed by 2027.

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Energy Storage
Location
Alabama, United States of America
Updated
22 Jul 2026
Source
Hart Energy

ConstructChat

Ask ConstructChat about Alabama Power Gorgas Battery Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Alabama Power Gorgas Battery Facility” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Alabama, United States. Taiyo aggregates data on it from Hart Energy.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Alabama Power plans to develop a 150-MW utility-scale battery energy storage system on the site of a former coal-fired power plant. Construction is expected to begin this year and be completed by 2027.

Original sector

Energy

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Hart Energy

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Energy Storage

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project