logo

Alacati Wind Power Plant (ARES)

Sector: Power Generation (CCGT) • Location: Izmir, Turkey

Source: World Bank Group

Project
Active

ARES is Turkey's first BOT wind power plant, located 80km from Izmir on the western end of Cesme Peninsula.

ARES has been owned by Gucbirligi Holding Inc. since November 1998ARES, with 12 Vestas turbines and an installed power of a total of 7.2 MW, had its official inauguration on December 18, 1998. The project has been managed by a project team from Gucbirligi Holding Inc. The electric power pr

Status
Prospective
Sector
Power Generation (CCGT), Wind, Commercial, Government
Location
Izmir, Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Alacati Wind Power Plant (ARES)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alacati Wind Power Plant (ARES)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Izmir, Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ARES is Turkey's first BOT wind power plant, located 80km from Izmir on the western end of Cesme Peninsula. ARES has been owned by Gucbirligi Holding Inc. since November 1998ARES, with 12 Vestas turbines and an installed power of a total of 7.2 MW, had its official inauguration on December 18, 1998. The project has been managed by a project team from Gucbirligi Holding Inc. The electric power produced with 34.5 kv by ARES will be sold to TEDAS for a period of 20 years and the estimated annual energy production amounts to 18,900,000 kWh. ARES provides for 20% of the electricity consumed by coastal towns of Alacati and Cesme, with a population of 50,000 in winter and over 100,000 during summer.

Original sector

Energy

Location

Country

Turkey

State

Izmir

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Commercial, Government

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project