logo

Alameda St. Widening from Harry Bridges to Anaheim South

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge

Project
Planning Schematics

The scope of work consists of widening Alameda Street by 17 feet from Harry Bridges Blvd to Anaheim Street and includes new curb & gutter, striping, storm drains, and catch basins. Additional right-of-way will be required. The project will widen 6,700 linear feet (1.3 miles) of Alameda Street by 27 to 32 on the west side and 7 to 12 feet on the east side of the street. After the widening, Alameda

Status
Prospective
Sector
Water Supply and Storage, Government, Bridge, Car parking, Road, Automotive, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
Location
Los Angeles, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Alameda St. Widening from Harry Bridges to Anaheim South

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Alameda St. Widening from Harry Bridges to Anaheim South” is an infrastructure initiative in the Water Supply and Storage sector, located in Los Angeles, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work consists of widening Alameda Street by 17 feet from Harry Bridges Blvd to Anaheim Street and includes new curb & gutter, striping, storm drains, and catch basins. Additional right-of-way will be required. The project will widen 6,700 linear feet (1.3 miles) of Alameda Street by 27 to 32 on the west side and 7 to 12 feet on the east side of the street. After the widening, Alameda Street will have a total roadway width of 80 to 86 (106 to 110 from property line to property lin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Los Angeles

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Bridge, Car parking, Road, Automotive, Waste Processing and Treatment, Manufacturing (Industrial), Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project