logo
ProjectClosed

Alamnagar-Utretia Railway Doubling Project

Closed · Uttar Pradesh

Source: India Investment Grid (IIG)

Information CAO/C/NR has come up with Alamnagar-Utretia Railway Doubling Project with a ticket size of 338 INR Crores. This project in Railway Track sub-sector involves Doubling/Electrification/Maintenance of Existing Track The current status of the project is Tender Awarded and is being developed through the EPC route. Economic/Social Impact of the Project The project will de-congest Lucknow Stat

Status
Closed
Sector
Mass Transit, Rail, Road, Government, Bridge
Location
Lucknow, Uttar Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Alamnagar-Utretia Railway Doubling Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alamnagar-Utretia Railway Doubling Project” is an infrastructure initiative in the Mass Transit sector, located in Lucknow, Uttar Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information CAO/C/NR has come up with Alamnagar-Utretia Railway Doubling Project with a ticket size of 338 INR Crores. This project in Railway Track sub-sector involves Doubling/Electrification/Maintenance of Existing Track The current status of the project is Tender Awarded and is being developed through the EPC route. Economic/Social Impact of the Project The project will de-congest Lucknow Station by-passing it , thereby significantly improving the mobility of coal and other essential commodities.

Original sector

Railways

Procurement method

Budget

Location

Country

India

State

Uttar Pradesh

City

Lucknow

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Road, Government, Bridge

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project