Alaoa Multipurpose Dam Project
Sector: Water Supply and Storage • Location: Samoa
Source: Asian Development Bank (ADB)
The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The sec
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government
- Location
- Samoa
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Alaoa Multipurpose Dam Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The secondary objective is to improve the stability of the water supply during dry periods and reduce the turbidity of raw water taken into Apia's main water treatment plant during flood periods. The tertiary objective is to install a hydropower capacity of 0.60 MW, generating 2.12 GWh of clean electricity. The project will support the government's 70% renewable energy target for electricity generation by 2031. The project will enhance non-physical flood management systems and capacity and the biodiversity conservation and management capacity associated with the proposed dam development. |
Original sector | Energy |
Budget |
Location
Country | Samoa |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
