logo
ProjectActive

Alaoa Multipurpose Dam Project

Active · Samoa

Source: Asian Development Bank (ADB)

The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The sec

Status
Prospective
Sector
Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government
Location
Samoa
Updated
19 Nov 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Alaoa Multipurpose Dam Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alaoa Multipurpose Dam Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Samoa. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The secondary objective is to improve the stability of the water supply during dry periods and reduce the turbidity of raw water taken into Apia's main water treatment plant during flood periods. The tertiary objective is to install a hydropower capacity of 0.60 MW, generating 2.12 GWh of clean electricity. The project will support the government's 70% renewable energy target for electricity generation by 2031. The project will enhance non-physical flood management systems and capacity and the biodiversity conservation and management capacity associated with the proposed dam development.

Original sector

Energy

Budget

Location

Country

Samoa

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Hydro, Government

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project