logo

Alaoa Multipurpose Dam Project

Sector: Water Supply and Storage • Location: Samoa

Source: Asian Development Bank (ADB)

Project
Active

The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The sec

Project Information FAQ

Project Information

5 Q
The project “Alaoa Multipurpose Dam Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Samoa. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The secondary objective is to improve the stability of the water supply during dry periods and reduce the turbidity of raw water taken into Apia's main water treatment plant during flood periods. The tertiary objective is to install a hydropower capacity of 0.60 MW, generating 2.12 GWh of clean electricity. The project will support the government's 70% renewable energy target for electricity generation by 2031. The project will enhance non-physical flood management systems and capacity and the biodiversity conservation and management capacity associated with the proposed dam development.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data