ALBA Asia
Sector: Chemical (Industrial) • Location: China
Source: IFC Project Disclosures
IFC plans to invest up to US$100 million, including 1) up to US$[60] million C loan (“Tranche 1”), and 2) a potential up to US$[40] million quasi-equity or equity (“Tranche 2”) to ALBA Group Asia Ltd. (ALBA Group Asia Ltd. and Dugong Ltd., collectively is referred to “ALBA Asia” or the “Company”). The Tranche 1 is to support the company’s development and managem
- Status
- Prospective
- Sector
- Chemical (Industrial), Wind, Natural Gas, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Metal, Residential, Manufacturing (Industrial), Government
- Location
- China
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about ALBA Asia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | IFC plans to invest up to US$100 million, including 1) up to US$[60] million C loan (“Tranche 1”), and 2) a potential up to US$[40] million quasi-equity or equity (“Tranche 2”) to ALBA Group Asia Ltd. (ALBA Group Asia Ltd. and Dugong Ltd., collectively is referred to “ALBA Asia” or the “Company”). The Tranche 1 is to support the company’s development and management of a pipeline of hazardous waste (“HW”) treatment and biowaste (“BW”) treatment projects in China (the “Project”). The Company is a regional platform established by the shareholders of ALBA Group (ALBA Group also the “Sponsor”, or “ALBA”), a privately-owned global leading waste management and recycling group originated in Germany, to invest several selected high-potential waste management segments in China.ALBA Asia currently operates two plants in China, HW Jiangsu plant for inorganic hazardous waste (HW) recycling (acquired in December 2018) and BW Hainan plant for biowaste (BW) treatment (acquired in July 2019). A gas turbine of 2.5 MW is also under construction onsite which will be fueled with methane from biowaste digestion. Under the proposed investment, ALBA Asia will acquire or build additional HW treatment/recycling plants and additional BW treatment plants (the “Project”). HW Jiangsu plant is located inside a chemical/metal-processing industry park, and BW Hainan plant is inside a municipal waste treatment/disposal industry zone. Three pipeline projects for HW treatment plants will also be located in industrial areas, while the BW treatment plant projects will be located in or close to urban areas: HW Jiangsu Plant – existing hazardous waste treatment plant with planned expansion (approximately 1.5 km to nearest residential community)HW Hebei Plant – existing hazardous waste treatment plant, which is a planned acquisition (approximately 7 km to nearest residential community)HW Henan Plant – planned greenfield hazardous waste treatment plant (approximately 1.5 km to nearest residential community)HW Guangdong Plant – planned greenfield hazardous waste treatment plant (approximately 1.2 km to nearest residential community)BW Hainan Plant – existing biowaste treatment plant with planned expansion (approximately 1.5 km to nearest residential community)BW Henan Plant – planned greenfield biowaste treatment plant (site not decided)BW Guizhou Plant – planned greenfield biowaste treatment plant (site not decided)BW Guangdong Plant – planned greenfield biowaste treatment plant (site not decided) Inorganic hazardous waste treatment and recycling are carried out at HW Jiangsu and HW Henan plants and are mainly through slurrying, detoxifying, pre-treatment with slaked lime, purification, and extraction of metallic elements. Organic hazardous waste treatment will be carried out at HW Hebei, HW Henan, and HW Guangdong plants. The company is considering constructing onsite engineered landfills at selected organic HW treatment plants, to dispose of the fly/bottom ashes from the HW incinerator. The biowaste treated at Hainan, and which will be treated at the other three planned sites, are mainly restaurant/residential kitchen wastes, human sanitary waste and agriculture wastes. The main treatment is thorough physical separation to sort out non-digestible materials and anaerobic digestion with recovery of methane as compressed natural gas (CNG) for sale. |
Original sector | other |
Location
Country | China |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Wind, Natural Gas, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Metal, Residential, Manufacturing (Industrial), Government |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in China
- Sewage treatment project in Sun Village
- Hebei Waste-to-Energy Plant
- Zhanjiang Integrated Refinery and Petrochemical Complex
- Merck Serono’s Pharmaceutical Manufacturing Facility, Nantong, China
- Lonza Niacinamide Production Facility, Iksan, South Korea
- Fenyi County Rainbow Fine Chemical 35MW Solar Power Plant
- Zhejiang New Centrury Petrochemical Port Project
- Zhangdian East Chemical Industry Park Industrial Waste Water Treatment Plant Phase II