logo
ProjectComplete

Albania Power Sector Reconstruction

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptar

Status
Closed
Sector
Geothermal, Oil and Gas, Power Generation (CCGT), Hydro, Residential
Location
Albania
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Albania Power Sector Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Albania Power Sector Reconstruction” is an infrastructure initiative in the Geothermal sector, located in Albania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptare (KESH). The EBRD has signed a loan of EUR 30 million to KESH. EUR 60 million. The project concerns the modernisation of two hydro power plants and the construction or improvement of transmission and distribution lines. The project replaces two existing modern-isation projects for which environmental due diligence studies were carried out, including an environmental impact assessment for a transmission line. Public consultation was also carried out for the previous projects. New project components (for example, a transmission line) will comply with relevant EU and international standards, and issues identified during environmental due diligence (e.g. PCB analysis of transformer oil) have either already been addressed or will be addressed as part of this new project. The project is expected to have an overall positive environmental impact by helping to replace polluting thermal power stations with hydro-power capacity and also by reducing transmission line losses. None.

Original sector

Energy

Location

Country

Albania

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Geothermal, Oil and Gas, Power Generation (CCGT), Hydro, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project