Albania Power Sector Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptar
- Status
- Closed
- Sector
- Geothermal, Oil and Gas, Power Generation (CCGT), Hydro, Residential
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Albania Power Sector Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptare (KESH). The EBRD has signed a loan of EUR 30 million to KESH. EUR 60 million. The project concerns the modernisation of two hydro power plants and the construction or improvement of transmission and distribution lines. The project replaces two existing modern-isation projects for which environmental due diligence studies were carried out, including an environmental impact assessment for a transmission line. Public consultation was also carried out for the previous projects. New project components (for example, a transmission line) will comply with relevant EU and international standards, and issues identified during environmental due diligence (e.g. PCB analysis of transformer oil) have either already been addressed or will be addressed as part of this new project. The project is expected to have an overall positive environmental impact by helping to replace polluting thermal power stations with hydro-power capacity and also by reducing transmission line losses. None. |
Original sector | Energy |
Location
Country | Albania |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Oil and Gas, Power Generation (CCGT), Hydro, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Albania
- VLORE THERMAL POWER PLANT
- Agricultural WastE as Sustainable 0 km building MatErial
- Alternative Tourism
- VLORE THERMAL POWER GENERATION PROJECT
- Patos-Marinza Environmental Remediation and Development
- Vlora Energy Hub
- Vlora Thermal Power Plant Gas Usage
- US LNG Supply Deal and Vlorë Energy Hub Development in Albania
