Albania Power Sector Reconstruction
Sector: Geothermal • Location: Albania
Source: European Bank for Reconstruction and Development (EBRD)
Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptar
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Modernisation of main hydro plants and transmission and distribution networks in Albania. The project aims to: The project is expected to: By increasing the availability and reliability of power supply in Albania, the project will directly contribute to: Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptare (KESH). The EBRD has signed a loan of EUR 30 million to KESH. EUR 60 million. The project concerns the modernisation of two hydro power plants and the construction or improvement of transmission and distribution lines. The project replaces two existing modern-isation projects for which environmental due diligence studies were carried out, including an environmental impact assessment for a transmission line. Public consultation was also carried out for the previous projects. New project components (for example, a transmission line) will comply with relevant EU and international standards, and issues identified during environmental due diligence (e.g. PCB analysis of transformer oil) have either already been addressed or will be addressed as part of this new project. The project is expected to have an overall positive environmental impact by helping to replace polluting thermal power stations with hydro-power capacity and also by reducing transmission line losses. None. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
