Albanian Railways
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign loan of up to EUR 36.87 million to the Republic of Albania for the benefit of Albanian Railways ("HSH", the "Client" or the "Company") to finance: i) the rehabilitation and upgrade of approximately 34.7 km railway line between the Tirana Public Transport Terminal ("PTT") and the city of Durres; and ii) the construction of an approximately 7.4 km railway branch line to the
- Status
- Under Construction
- Sector
- Rail, Airport, Mass Transit, Road, Government, Raw Materials, Commercial, Residential
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Albanian Railways
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign loan of up to EUR 36.87 million to the Republic of Albania for the benefit of Albanian Railways ("HSH", the "Client" or the "Company") to finance: i) the rehabilitation and upgrade of approximately 34.7 km railway line between the Tirana Public Transport Terminal ("PTT") and the city of Durres; and ii) the construction of an approximately 7.4 km railway branch line to the Tirana International Airport ("TIA") (together "the Project"). An increase by up to EUR 40.7 million of the existing sovereign loan of EUR 36.87 million in favour of the Republic of Albania was provided to finance: i) the construction of approximately eight stations and stops along the Tirana-Durres railway line and along the new rail connection to TIA; ii) cost increases resulting from price adjustments and design improvements; and iii) additional works supervision services. An additional loan increase by up to EUR 11.62 million will be provided to co-finance the electrification of the railway lines financed under the Project, namely, the Tirana PTT - Durres railway line, and the new rail link to TIA. The Project is co-financed by the European Union ("EU") through the Western Balkans Investment Framework ("WBIF") which has provided investment grants in the amount of up to EUR 32.94 million and technical assistance grants in the amount of up to EUR 2.5 million. Additional WBIF grants are expected to be provided to co-finance the Project's electrification component. |
Original sector | Transport |
Budget |
Location
Country | Albania |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Rail, Airport, Mass Transit, Road, Government, Raw Materials, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in Albania
- Intercommercial Bank S.A. Albania
- Giorgi Alfo Sh.p.k.
- Reconstruction of Durres-Rrogozhine Railway Line
- Energji Ashta Shpk (Ashta)
- Alpha Bank Mandatory Reserves Coverage
- Building waste sustainibility: new capacities for sustainable waste management
- Improving Tourism Offer in Highlands of Albania and Kosovo
- Fostering Creativity and Connecting Cultural Assets through Monuments
