logo

Albert Lea City of AWOS Replacement

Sector: Manufacturing (Industrial) • Location: Albert Lea, Minnesota, United States of America

Source: Dodge

Project
Bidding

COMMON EXCAVATION 84 CU YD; SENSOR FOUNDATIONS 1 LUMP SUM, GEOTEXTILE FABRIC 75 SQ YD; SENSOR PADS 1 LUMP SUM; AGGREGATE BASE, CL 5 70 CU YD; \CONNECT TO EXISTING ELECTRICAL SERVICE 1 LUMP SUM; 2"-3" LANDSCAPING ROCK 16 CU YD; SILT FENCE, TYPE MS 250 LIN FT; REMOVE EXISTING AWOS EQUIPMENT AND FOUNDATIONS 1 LUMP SUM; SITE RESTORATION 1 LUMP SUM; TOWER FOUNDATION 1 LUMP SUM; MATERIALS TESTING 1 LUMP

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT), Commercial, Advanced Electronics, Government
Location
Albert Lea, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Albert Lea City of AWOS Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Albert Lea City of AWOS Replacement” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Albert Lea, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

COMMON EXCAVATION 84 CU YD; SENSOR FOUNDATIONS 1 LUMP SUM, GEOTEXTILE FABRIC 75 SQ YD; SENSOR PADS 1 LUMP SUM; AGGREGATE BASE, CL 5 70 CU YD; \CONNECT TO EXISTING ELECTRICAL SERVICE 1 LUMP SUM; 2"-3" LANDSCAPING ROCK 16 CU YD; SILT FENCE, TYPE MS 250 LIN FT; REMOVE EXISTING AWOS EQUIPMENT AND FOUNDATIONS 1 LUMP SUM; SITE RESTORATION 1 LUMP SUM; TOWER FOUNDATION 1 LUMP SUM; MATERIALS TESTING 1 LUMP SUM

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Albert Lea

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Commercial, Advanced Electronics, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project