Alberta Highway 63

Sector: Bridge • Location: Canada

Source: Road Traffic Technology

Project
Closed

Alberta Highway 63 is a north–south highway in northern Alberta, Canada. Credit: Government of Alberta. The Alberta Highway 63 stretches 443km and is operated and maintained by Transport Authority of Alberta. Credit: Government of Alberta. A section stretching 36km on the Alberta Highway 63 was twinned and opened in October 2012. Credit: Government of Alberta. A $778m twinning project on 188km sec

Project Information FAQ

Project Information

4 Q
The project “Alberta Highway 63” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Alberta Highway 63 is a north–south highway in northern Alberta, Canada. Credit: Government of Alberta. The Alberta Highway 63 stretches 443km and is operated and maintained by Transport Authority of Alberta. Credit: Government of Alberta. A section stretching 36km on the Alberta Highway 63 was twinned and opened in October 2012. Credit: Government of Alberta. A $778m twinning project on 188km section of the Alberta Highway 63 was started in late 2012. Credit: Government of Alberta. Alberta Highway 63 is a north-south highway in northern Alberta, Canada. It begins at an intersection of Highway 28, approximately 6km (3.7 miles) south-west of Radway, and passes through Boyle and Fort McMurray, ending 16km (9.9 miles) north of its second crossing of the Athabasca River near Fort MacKay. The 443km highway is operated and maintained by the Transport Authority of Alberta. The number of sections of the highway has been expanded to four lanes since 2002. A 36km section on the highway was twinned and opened in October 2012. The $84m project was completed approximately nine months ahead of schedule. A $778m twinning project on 188km section of the highway began in late-2012 and was completed in May 2016. The growth of the oil-sands development in the Wood Buffalo region has resulted in a higher than expected growth in traffic on Highway 63. Heavy trucks carrying equipment for the oil-sands projects occupy the existing two traffic lanes, which causes traffic delays. Most of the highway is a two-lane undivided road, except the 55km section from south of its intersection with Highway 881 through Fort McMurray to the south of Fort MacKay. Further, being the only all-weather road from Fort McMurray, Highway 63 has become a crucial link. The provincial government announced in February 2006 the expansion of Highway 63 from a two-lane undivided road to a four-lane divided highway starting from Atmore, which is located just south of Fort McMurray. The twinning work began in 2006 and was estimated to take at least five years to complete. Meanwhile, many improvement projects were completed to enhance the operation of the highway. A $155m twinning project began on a 45km highway section between Fort McMurray and north of Mildred Lake in 2002 and was completed in 2008. A $53m twinning project was completed between 2006 and 2008 on a 16km section between Fort McMurray and south of Highway 881. Two new interchanges at Thickwood Boulevard and Confederation Way were completed between 2008 and 2012 at a cost of $220m. An $84m twinning project of the highway to the north of Wandering River started in 2009 and was completed in 2012. A twinning project on a 188km two-lane section of highway between Grassland and Fort McMurray started in late-2012. The $778m project was completed in May 2016. A new $127m five-lane bridge over the Athabasca River was completed between 2008 and 2011 on Highway 63. A reconstruction project of Steinhauer Bridge over the Athabasca River started in 2011. The $51.7m project was completed in 2012. Another reconstruction project of Grant MacEwan Bridge over the Athabasca River started in 2011. The $23.3m project was opened to the public in December 2013, seven months ahead of schedule. Prairie Roadbuilders were the contractors for the 36km twinning north of Wandering River. Ledcor, a construction company was also involved in the 36km tuning project. Flatiron Construction was the contractor for the construction of the Grant MacEwan Bridge over the Athabasca River. South Rock was the construction contractor for the two new interchanges at Thickwood Boulevard and Confederation Way. Carmacks was awarded the contract for the widening of the last section of Highway 63.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data