logo
ProjectIn Progress

Alberta Infrastructure - Bundle 10 - Alberta Province-Wide Retrofit, Replacement, and Upgrade Projects

In progress · Alberta

Source: Infrastructure Canada

• Devon High Head Laboratory: Replace gas sensors • Devon High Head Laboratory: Replace glycol distribution system • Calgary Courts Centre: Fire alarm / video surveillance • Edmonton Royal Alberta Museum: Install ground trucks for maintenance safety • Grande Prairie Provincial Building: Replace generator • Grande Prairie Provincial Building: Renew bathroom / janitor closet • Red Deer Provincial Bu

Status
Under Construction
Sector
Cement, Manufacturing (Industrial), Commercial, Government
Location
Alberta, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Alberta Infrastructure - Bundle 10 - Alberta Province-Wide Retrofit, Replacement, and Upgrade Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Alberta Infrastructure - Bundle 10 - Alberta Province-Wide Retrofit, Replacement, and Upgrade Projects” is an infrastructure initiative in the Cement sector, located in Alberta, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

• Devon High Head Laboratory: Replace gas sensors • Devon High Head Laboratory: Replace glycol distribution system • Calgary Courts Centre: Fire alarm / video surveillance • Edmonton Royal Alberta Museum: Install ground trucks for maintenance safety • Grande Prairie Provincial Building: Replace generator • Grande Prairie Provincial Building: Renew bathroom / janitor closet • Red Deer Provincial Building: Replace roof • Lethbridge Correctional Centre: Replace security access panels • Vegreville Alberta Research Council Building: Replace exterior entrance doors & joints • Vegreville Alberta Research Council Building: Replace roof • Wainwright Courthouse: Replace fire alarm system • Calgary Young Offenders Centre: Replace fire system • Grande Prairie Courthouse: Replace exterior door hardware • Red Deer Remand Centre: Renovate flooring and finishes • Calgary Fish Hatchery & Rearing Station: Replace exhaust fans and cooling • Cochrane Provincial Building: Elevator upgrade • Pincher Creek Provincial Building: Masonry renovations • Fort Saskatchewan Correction Centre Admin Building: Replace compressed air systems • Red Deer Courthouse: Replace heating systems • Drumheller Royal Tyrrell Museum Of Paleontology: Replace cooling tower • Edson Provincial Building and Courthouse: Renew security access • Lethbridge Provincial Building: Renew fire alarm control panel • Bonnyville Provincial Building: Replace boilers • Drumheller Royal Tyrrell Museum Of Paleontology: Replace building motor control system • Drumheller Provincial Building: Repair concrete/fire separation

Original sector

Ventilation Systems

Location

Country

Canada

State

Alberta

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Manufacturing (Industrial), Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project