logo
ProjectClosed

Alberta Innovates Facilities - Fume Hood Replacement Phase 1

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Work of this Contract comprises the following: .1 PART `A? - Edmonton: the majority of this component of the Work will include the decommissioning and removal of approximately 30 existing fume hoods (please refer to the drawings) and their replacement with new fume hoods and removal and replacement of associated mechanical and electrical work for base building equipment. Removal of hazardous mater

Status
Closed
Sector
Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial)
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Alberta Innovates Facilities - Fume Hood Replacement Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Alberta Innovates Facilities - Fume Hood Replacement Phase 1” is an infrastructure initiative in the Commercial sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work of this Contract comprises the following: .1 PART `A? - Edmonton: the majority of this component of the Work will include the decommissioning and removal of approximately 30 existing fume hoods (please refer to the drawings) and their replacement with new fume hoods and removal and replacement of associated mechanical and electrical work for base building equipment. Removal of hazardous materials as encountered. Currently, for Physical lab spaces, the mechanical and electrical replacemen...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project