Alcott & Smith Elementary Schools Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project consists of the on-site replacement of an existing elementary school at Louisa May Alcott (Alcott) and Samantha Smith (Smith) Elementary School sites, and associated site support spaces, parking, utilities, storm water detention. There are two phases of construction for this project which includes construction at two existing elementary schools. The first phase of construction is the A
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Car parking, Education, Power Transmission, Government, Automotive, Power Generation (CCGT)
- Location
- Redmond, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Alcott & Smith Elementary Schools Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the on-site replacement of an existing elementary school at Louisa May Alcott (Alcott) and Samantha Smith (Smith) Elementary School sites, and associated site support spaces, parking, utilities, storm water detention. There are two phases of construction for this project which includes construction at two existing elementary schools. The first phase of construction is the Alcott Core Expansion with Mahlum Architects as the architect of record. For the subsequent phase(... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Redmond |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Car parking, Education, Power Transmission, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
