logo

Alderville First Nation - Communal and Point-of-Entry Water Treatment Systems

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

The project will expand and rehabilitate the water treatment system in the Alderville First Nation in Ontario. The work will involve: drilling a new well; replacing small water treatment systems with a high-capacity, communal treatment plant with back-up power; installing an underground reservoir for water storage and high lift pump station; establishing a truck fill connection; installing 750 me

Project Information FAQ

Project Information

5 Q
The project “Alderville First Nation - Communal and Point-of-Entry Water Treatment Systems” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will expand and rehabilitate the water treatment system in the Alderville First Nation in Ontario. The work will involve: drilling a new well; replacing small water treatment systems with a high-capacity, communal treatment plant with back-up power; installing an underground reservoir for water storage and high lift pump station; establishing a truck fill connection; installing 750 metres of piping to connect the communal plant to 18 buildings; rehabilitating and upgrading 32 existing point-of-entry (POE) systems (equipment that treats water when a service line enters a building), and adding 10 residential POE systems; and decommissioning unused wells. The project will increase access to potable water and improve water quality, which will reduce the need for short-term boil water advisories and provide for emergency storage. In addition, the decommissioning of unused wells will decrease the risk of aquifer contamination.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data