logo

AL/DOT: CR-83 Pavement Resurfacing

Sector: Manufacturing (Industrial) • Location: Pike Road, Alabama, United States of America

Source: Dodge

Project
Closed

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-83 (Wallahatchie Road) from the junction of CR-85 (Pike Road) to the junction of SR-110 in Pike Road. Length 4.565 mi.

Status
Closed
Sector
Manufacturing (Industrial), Road, Commercial
Location
Pike Road, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about AL/DOT: CR-83 Pavement Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AL/DOT: CR-83 Pavement Resurfacing” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Pike Road, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for constructing the Planing, Resurfacing, and Traffic Stripe on CR-83 (Wallahatchie Road) from the junction of CR-85 (Pike Road) to the junction of SR-110 in Pike Road. Length 4.565 mi.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Pike Road

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Road, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project