AL/DOT: I-20 Intersection Improvements
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge
for constructing the Intersection Improvements and Additional Thru Lanes (Grading, Drainage, Traffic Signal Installations, Traffic Signal Upgrades, and Intelligent Traffic Systems (ITS) Installation) on I-20/I-59 at the Daimler Benz Boulevard Interchange (Exit 89) in Vance. Length 0.262 mi.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Vance, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AL/DOT: I-20 Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for constructing the Intersection Improvements and Additional Thru Lanes (Grading, Drainage, Traffic Signal Installations, Traffic Signal Upgrades, and Intelligent Traffic Systems (ITS) Installation) on I-20/I-59 at the Daimler Benz Boulevard Interchange (Exit 89) in Vance. Length 0.262 mi. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Vance |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
