AL/DOT: I-65 Added lanes and Bridge Replacement
Sector: Water Supply and Storage • Location: Birmingham, Alabama, United States of America
Source: Dodge USA
for constructing the Roadway Improvements and Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, and Bridge Replacement) on I-65 from the SR-3 (US-31) Interchange north of Calera to a point 0.200 mile south of the CR-87 Interchange southeast of Alabaster. Length 2.564 mi.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | for constructing the Roadway Improvements and Additional Lanes (Grading, Drainage, Pavement, Bridge Removal, and Bridge Replacement) on I-65 from the SR-3 (US-31) Interchange north of Calera to a point 0.200 mile south of the CR-87 Interchange southeast of Alabaster. Length 2.564 mi. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
