logo

AL/DOT: I-85 Bridge Widening (CO 003)

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Project
Closed

For constructing the Bridge Widening (Grading, Drainage, Pavement, and Bridge Widening) on I-85 (Southbound Roadway) over Miles Creek to accommodate the Deceleration Lane Extension at SR-186 northeast of Tuskegee. Length 0.355 mi.

Status
Closed
Sector
Road, Bridge, Waste Processing and Treatment, Water Supply and Storage, Commercial
Location
Tuskegee, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about AL/DOT: I-85 Bridge Widening (CO 003)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AL/DOT: I-85 Bridge Widening (CO 003)” is an infrastructure initiative in the Road sector, located in Tuskegee, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For constructing the Bridge Widening (Grading, Drainage, Pavement, and Bridge Widening) on I-85 (Southbound Roadway) over Miles Creek to accommodate the Deceleration Lane Extension at SR-186 northeast of Tuskegee. Length 0.355 mi.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Tuskegee

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Bridge, Waste Processing and Treatment, Water Supply and Storage, Commercial

Article published date

2024-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project