logo

AL/DOT: I-85 Pavement Preservation

Sector: Road • Location: Tuskegee, Alabama, United States of America

Source: Dodge

Project
Closed

Pavement Preservation, Bridge Rail Retrofit, and Traffic Stripe on I-85 from a point 0.700 mile south of the Exit 22 Interchange (MP 21.559) in Shorter to a point 1.000 mile north of the CR-36 Overpass (MP 35.839) east of Franklin. Length 14.277 mi.

Status
Closed
Sector
Road, Rail, Bridge, Commercial
Location
Tuskegee, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about AL/DOT: I-85 Pavement Preservation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AL/DOT: I-85 Pavement Preservation” is an infrastructure initiative in the Road sector, located in Tuskegee, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pavement Preservation, Bridge Rail Retrofit, and Traffic Stripe on I-85 from a point 0.700 mile south of the Exit 22 Interchange (MP 21.559) in Shorter to a point 1.000 mile north of the CR-36 Overpass (MP 35.839) east of Franklin. Length 14.277 mi.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Tuskegee

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Rail, Bridge, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project