logo
ProjectConstruction Documents

AL/DOT: Resurfacing Improvements

One of 10,000+ projects Taiyo tracks in Alabama.

Source: Dodge USA

RESURFACING, SCRUB SEAL, AND STEEL BLOCKOUT REPLACEMENT AREA WIDE (GROVE HILL): SR-10 (MP 0-7.62); SR-59 (MP 80.68-93.66); SR-17 (MP 84.32-91.38); SR-21 (MP 84.08-91.41); SR-41 (74.09-80.61); SR-154 (MP 16.14-21.88) (PM1) PREVENTATIVE MAINTENANCE LEVEL 1

Status
Closed
Sector
Steel, Metal, Commercial, Manufacturing (Industrial)
Location
Grove Hill, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about AL/DOT: Resurfacing Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AL/DOT: Resurfacing Improvements” is an infrastructure initiative in the Steel sector, located in Grove Hill, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

RESURFACING, SCRUB SEAL, AND STEEL BLOCKOUT REPLACEMENT AREA WIDE (GROVE HILL): SR-10 (MP 0-7.62); SR-59 (MP 80.68-93.66); SR-17 (MP 84.32-91.38); SR-21 (MP 84.08-91.41); SR-41 (74.09-80.61); SR-154 (MP 16.14-21.88) (PM1) PREVENTATIVE MAINTENANCE LEVEL 1

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Grove Hill

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Metal, Commercial, Manufacturing (Industrial)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project