logo

AL/DOT: SR 6 Resurfacing Improvements

Sector: Mass Transit • Location: Gordo, Alabama, United States of America

Source: Dodge

Project
Closed

for constructing the Safety Widening, Planing, Resurfacing, Access Management, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from a point 0.243 mile west of the junction of Echola Road to a point 0.250 mile west of the junction of Buhl Cutoff Road. Length 4.790 mi.

Status
Closed
Sector
Mass Transit, Rail, Road, Commercial
Location
Gordo, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about AL/DOT: SR 6 Resurfacing Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AL/DOT: SR 6 Resurfacing Improvements” is an infrastructure initiative in the Mass Transit sector, located in Gordo, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for constructing the Safety Widening, Planing, Resurfacing, Access Management, Guardrail Installation, and Traffic Stripe on SR-6 (US-82) from a point 0.243 mile west of the junction of Echola Road to a point 0.250 mile west of the junction of Buhl Cutoff Road. Length 4.790 mi.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Gordo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Road, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project