AL/DOT: SR-8 (US-80) Roadway Improvements
Sector: Water Supply and Storage • Location: Phenix City, Alabama, United States of America
Source: Dodge
for constructing the Intersection and Roadway Improvements (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-8 (US-80) at SR-1 (US-280) to include Left Turn Lane Additions and Median Modifications in Phenix City. Length 0.463 mi.
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Road, Mass Transit, Manufacturing (Industrial)
- Location
- Phenix City, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AL/DOT: SR-8 (US-80) Roadway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for constructing the Intersection and Roadway Improvements (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe) on SR-8 (US-80) at SR-1 (US-280) to include Left Turn Lane Additions and Median Modifications in Phenix City. Length 0.463 mi. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Phenix City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Waste Processing and Treatment, Commercial, Road, Mass Transit, Manufacturing (Industrial) |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
