AL/DOT: SR 87 Micro-Surfacing Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Resurfacing (Micro-Surfacing Seal Coat, Type II and Scrub Seal), and Traffic Stripe on SR-87 from the junction of SR-134 to the junction of East Davis Street in Elba. Length 7.667 mi.
- Status
- Closed
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- Elba, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AL/DOT: SR 87 Micro-Surfacing Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Resurfacing (Micro-Surfacing Seal Coat, Type II and Scrub Seal), and Traffic Stripe on SR-87 from the junction of SR-134 to the junction of East Davis Street in Elba. Length 7.667 mi. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Elba |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
