ALES Energy Transition and Modernization Project
Sector: Fertilizers • Location: Kazakhstan
Source: Asian Development Bank (ADB)
The proposed Project will gradually decommission and replace inefficient coal-based power generating units with combined cycle gas turbine (CCGT) units with an installed capacity of up to 600 MW for electricity and 957 GCal/h for heat. The plant will be constructed at the existing site of the Almaty combined heat plant 2 (CHP-2) with all grid and heating pipeline infrastructure in place.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed Project will gradually decommission and replace inefficient coal-based power generating units with combined cycle gas turbine (CCGT) units with an installed capacity of up to 600 MW for electricity and 957 GCal/h for heat. The plant will be constructed at the existing site of the Almaty combined heat plant 2 (CHP-2) with all grid and heating pipeline infrastructure in place. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
