ALES Energy Transition and Modernization Project
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
The proposed Project will gradually decommission and replace inefficient coal-based power generating units with combined cycle gas turbine (CCGT) units with an installed capacity of up to 600 MW for electricity and 957 GCal/h for heat. The plant will be constructed at the existing site of the Almaty combined heat plant 2 (CHP-2) with all grid and heating pipeline infrastructure in place.
- Sector
- Power Generation (CCGT), Fertilizers, Commercial, Government, Wind
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about ALES Energy Transition and Modernization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Project will gradually decommission and replace inefficient coal-based power generating units with combined cycle gas turbine (CCGT) units with an installed capacity of up to 600 MW for electricity and 957 GCal/h for heat. The plant will be constructed at the existing site of the Almaty combined heat plant 2 (CHP-2) with all grid and heating pipeline infrastructure in place. |
Original sector | Energy |
Location
Country | Kazakhstan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Fertilizers, Commercial, Government, Wind |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
