logo
ProjectActive

Alfanar Windfarm Project

One of 9,044 projects Taiyo tracks in Gujarat.

Source: World Bank Group

The project entails the construction of a 300 MW wind power plant in Bhuj, Gujarat, India. Sponsor of the project is Alfatanar Energy while the finance ($ 200.75 million) is provided by L&T Finance and L&T Infrastructure Finance. Alfanar Group was awarded a PPA in 2017 with a price of (~$0.0381)/kWh in Tranche-V wind auction conducted by the Solar Energy Corporation of India (SECI). Financial clo

Status
Prospective
Sector
Power Generation (CCGT), Wind, Solar, Commercial, Government
Location
Gujarat, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Alfanar Windfarm Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alfanar Windfarm Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gujarat, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a 300 MW wind power plant in Bhuj, Gujarat, India. Sponsor of the project is Alfatanar Energy while the finance ($ 200.75 million) is provided by L&T Finance and L&T Infrastructure Finance. Alfanar Group was awarded a PPA in 2017 with a price of (~$0.0381)/kWh in Tranche-V wind auction conducted by the Solar Energy Corporation of India (SECI). Financial close took place on September 29, 2018. https://electricenergyonline.com/article/energy/category/wind/141/726314/alfanar-reaches-financial-closure-for-its-landmark-ists-connected-300-mw-wind-ipp-project-in-india.html WB files

Original sector

Energy

Budget

Location

Country

India

State

Gujarat

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Solar, Commercial, Government

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project