Alga Norte Aquatic Center Restroom and Locker Room Repairs
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The Work includes the provision of all equipment, labor, materials, tools, services, transportation, permits, utilities, and all other items necessary to complete the construction of the following, as specified and shown in the Construction Documents: repair and renovate the aquatic center s building three men s and women s locker room and shower areas, including the family restroom showers, and f
- Status
- Closed
- Sector
- Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Carlsbad, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Alga Norte Aquatic Center Restroom and Locker Room Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes the provision of all equipment, labor, materials, tools, services, transportation, permits, utilities, and all other items necessary to complete the construction of the following, as specified and shown in the Construction Documents: repair and renovate the aquatic center s building three men s and women s locker room and shower areas, including the family restroom showers, and floor and wall tile assemblies; provide temporary shower and toilet facilities and utility services. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carlsbad |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
