logo

Algeria - East-West Highway Construction Project - 13 km Section from Ain El Bey to the CW133 Interchange

Sector: Seaport • Location: Algeria

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Construction Project of the East-West Highway - 13 km between Ain El Bey and the CW133 Interchange. The project responds perfectly to the resolution of the double problem of the fluidity of traffic around Constantine and the support of traffic in transit. It’s fully in line with the actions taken by the government in the field of increasing the capacity of the

Project Information FAQ

Project Information

4 Q
The project “Algeria - East-West Highway Construction Project - 13 km Section from Ain El Bey to the CW133 Interchange” is an infrastructure initiative in the Seaport sector, located in Algeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Construction Project of the East-West Highway - 13 km between Ain El Bey and the CW133 Interchange. The project responds perfectly to the resolution of the double problem of the fluidity of traffic around Constantine and the support of traffic in transit. It’s fully in line with the actions taken by the government in the field of increasing the capacity of the transport infrastructure, through the development of motorway infrastructure, with priority given to the avoidance of large cities. The project is part of the government's economic recovery program with the primary objective of reducing transport time and ultimately contributing to the country's economic development. The intervention is all the more indispensable as it completes the 11 km motorway section nearing completion, financed by the Bank. The components of the project are as follows: (i) land acquisition; (ii) construction of a 12,500-ml stretch of motorway between Ain El Bey and the CW133 interchange; and (iii) work control and supervision services including geotechnical and quality control services as well as general project supervision by the Administration.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data