Algeria - East-West Highway Construction Project - 13 km Section from Ain El Bey to the CW133 Interchange
Sector: Seaport • Location: Algeria
Source: African Development Bank (AfDB)
The present intervention concerns the Construction Project of the East-West Highway - 13 km between Ain El Bey and the CW133 Interchange. The project responds perfectly to the resolution of the double problem of the fluidity of traffic around Constantine and the support of traffic in transit. It’s fully in line with the actions taken by the government in the field of increasing the capacity of the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention concerns the Construction Project of the East-West Highway - 13 km between Ain El Bey and the CW133 Interchange. The project responds perfectly to the resolution of the double problem of the fluidity of traffic around Constantine and the support of traffic in transit. It’s fully in line with the actions taken by the government in the field of increasing the capacity of the transport infrastructure, through the development of motorway infrastructure, with priority given to the avoidance of large cities. The project is part of the government's economic recovery program with the primary objective of reducing transport time and ultimately contributing to the country's economic development. The intervention is all the more indispensable as it completes the 11 km motorway section nearing completion, financed by the Bank. The components of the project are as follows: (i) land acquisition; (ii) construction of a 12,500-ml stretch of motorway between Ain El Bey and the CW133 interchange; and (iii) work control and supervision services including geotechnical and quality control services as well as general project supervision by the Administration. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
