logo

Algeria - Sidi Bel Abbes Drinking Water Supply Project

Sector: Water Supply and Storage • Location: Algeria

Source: African Development Bank (AfDB)

Project

The present project concerns the drinking water supply of Sidi Bel Abbes. It aims to contribute to improving the country's health and hygiene situation by increasing the supply of drinking water to the population. The project thus continues the Algerian Government's investment programme to meet the population's demand for drinking water. It should provide an annual volume of 22 million m3 to Sidi

Project Information FAQ

Project Information

4 Q
The project “Algeria - Sidi Bel Abbes Drinking Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Algeria. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project concerns the drinking water supply of Sidi Bel Abbes. It aims to contribute to improving the country's health and hygiene situation by increasing the supply of drinking water to the population. The project thus continues the Algerian Government's investment programme to meet the population's demand for drinking water. It should provide an annual volume of 22 million m3 to Sidi Bel Abbes, 2 million m3 to the secondary centres located along the supply line, and 10 million m3 to the Oran conurbation. The project has the following components: (A) acquisition of the land necessary for the project, (B) water treatment plant, (C) five raw water pumping stations and four treated water pumping stations, (D) supply and installation of the supply pipes with their ancillary equipment, (E) raw and treated water tanks and the buffer tanks of the pumping and distribution stations, (F) remote control and telecommunications installations, (G) connections to the medium-voltage electricity grid, (H) supervision and control of works, (I) support for EPDEMIA and AGEP, and (J) rehabilitation of the drinking water distribution network in Sidi Bel Abbes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data