logo

Algerian Power Plant Arbitration

Sector: Wind • Location: Algeria

Source: Law360

Project
Awarded

The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator.

Project Information FAQ

Project Information

5 Q
The project “Algerian Power Plant Arbitration” is an infrastructure initiative in the Wind sector, located in Algeria. Taiyo aggregates data on it from Law360.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Awarded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data