logo
ProjectAwarded

Algerian Power Plant Arbitration

Sector: Wind • Location: Algeria

Source: Law360

The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator.

Status
Closed
Sector
Wind, Power Generation (CCGT)
Location
Algeria
Updated
22 Jul 2026
Source
Law360

ConstructChat

Ask ConstructChat about Algerian Power Plant Arbitration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Algerian Power Plant Arbitration” is an infrastructure initiative in the Wind sector, located in Algeria. Taiyo aggregates data on it from Law360.

Participants

Company

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator.

Original sector

Energy

Budget

Location

Country

Algeria

Source

Source

Law360

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT)

Article published date

2025-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project