Algerian Power Plant Arbitration
Sector: Wind • Location: Algeria
Source: Law360
The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT)
- Location
- Algeria
- Updated
- 22 Jul 2026
- Source
- Law360
ConstructChat
Ask ConstructChat about Algerian Power Plant Arbitration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Eleventh Circuit upheld a lower court's ruling that requires reinsurers of an Algerian power plant to enter arbitration regarding a $28 million turbine failure. The ruling emphasizes that the plant's owner benefited from the services contract between General Electric and the plant operator. |
Original sector | Energy |
Budget |
Location
Country | Algeria |
Source
Source | Law360 |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2025-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
