Algonquins of Pikwakanagan Health Centre Renovations
Sector: Commercial • Location: Ontario, Canada
Source: Infrastructure Canada
This project will retrofit the Health Centre’s roof, which is in very poor condition, causing leaks which may result in mold, snow and ice build-up, and poor insulation / high energy loss. Energy efficiency will be improved by replacing the wood siding and wood frame windows with triple-paned windows, and increasing the basement insulation. The heating will be upgraded to an energy efficient heat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will retrofit the Health Centre’s roof, which is in very poor condition, causing leaks which may result in mold, snow and ice build-up, and poor insulation / high energy loss. Energy efficiency will be improved by replacing the wood siding and wood frame windows with triple-paned windows, and increasing the basement insulation. The heating will be upgraded to an energy efficient heat pump, which provides significant GHG savings. The propane unit will remain, providing back up support in the case of extreme cold temperatures. Energy saving will also come from upgrading to low flow plumbing fixtures and lighting to LEDs. Accessibility will be improved by retrofitting the bathroom and upgrading the ramp to the building to meet code. A wing of the Centre will be retrofitted to improve accessibility with wider hallways and larger door frames. As the Health Centre provides essential services to Elders and members with limited mobility, accessibility is of the utmost importance |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
