logo

Aliaga LNG Terminal LNG Carrier Arrival

Sector: LNG • Location: Izmir, Türkiye

Source: Anadolu Ajansı

Project
In Transit

Norwegian energy company BW Fleet Management's LNG carrier, Berge Arzew, with a capacity of 138,089 cubic meters, is scheduled to arrive at the Aliaga LNG Terminal in Izmir, Türkiye on July 13, 2026. The vessel left the Algerian port of Arzew on July 6, 2026, and is sailing under the flag of the Bahamas.

Status
Prospective
Sector
LNG
Location
Izmir, Turkey
Updated
22 Jul 2026
Source
Anadolu Ajansı

ConstructChat

Ask ConstructChat about Aliaga LNG Terminal LNG Carrier Arrival

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Aliaga LNG Terminal LNG Carrier Arrival” is an infrastructure initiative in the LNG sector, located in Izmir, Izmir, Türkiye. Taiyo aggregates data on it from Anadolu Ajansı.

Participants

Not available for this record.

Status

Original status

in transit

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Norwegian energy company BW Fleet Management's LNG carrier, Berge Arzew, with a capacity of 138,089 cubic meters, is scheduled to arrive at the Aliaga LNG Terminal in Izmir, Türkiye on July 13, 2026. The vessel left the Algerian port of Arzew on July 6, 2026, and is sailing under the flag of the Bahamas.

Original sector

Energy

Location

Country

Turkey

State

Izmir

City

Izmir

Source

Source

Anadolu Ajansı

URL

More Details

Record type

Project

Sector

LNG

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project