Aliaga Wind Energy Power Plant

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Bilgin Enerji [Turkey] implemented the 90MW Aliaga Wind Energy Power Plant project, near Bergama in Izmir province. The project was developed on a greenfield, merchant basis. The project received its generation license from the Energy Market Regulatory Authority (EPDK) on July 17, 2008. Electricity generated by the wind farm was to be delivered to the Turkish national grid. The facility was to g

Project Information FAQ

Project Information

4 Q
The project “Aliaga Wind Energy Power Plant” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bilgin Enerji [Turkey] implemented the 90MW Aliaga Wind Energy Power Plant project, near Bergama in Izmir province. The project was developed on a greenfield, merchant basis. The project received its generation license from the Energy Market Regulatory Authority (EPDK) on July 17, 2008. Electricity generated by the wind farm was to be delivered to the Turkish national grid. The facility was to generate up to 300 GWh of clean electricity annually and supply 150,000 households. Financial closure was reached in September 2008 with the signing of a EUR110 million (US$161.7 million) loan agreement between Bilgin Enerji and local bank Yapi Kredi. The total project cost was not available as of end 2009. The Aliaga project, considered as the largest in the country at the time of financial closure, was to comprise 36 Nordex wind turbines of the N90/2500 type, for which an equipment supply contract was signed in June 2009. Construction was expected to start in the winter of 2009 and the project was to be fully operational by May 2010. Total investment was ESTIMATED at 90 MW x 1.8 million per mw (average for ECA), is $162 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data