Alignment 14 of Rail Realignment Project
Proposed · California · Last reported Feb 2025
Source: NBC 7 San Diego
Alignment 14 is one of the proposed routes for the rail realignment project, which would take the train deeper into the Solana Beach trench and underneath the lagoon, avoiding residential areas. This alignment is estimated to cost between $7 billion and $9 billion.
- Status
- Prospective
- Sector
- Residential, Rail, Government
- Location
- Del Mar, California, United States of America
- Updated
- 22 Jul 2026
- Source
- NBC 7 San Diego
ConstructChat
Ask ConstructChat about Alignment 14 of Rail Realignment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Alignment 14 is one of the proposed routes for the rail realignment project, which would take the train deeper into the Solana Beach trench and underneath the lagoon, avoiding residential areas. This alignment is estimated to cost between $7 billion and $9 billion. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Del Mar |
Source
Source | NBC 7 San Diego |
URL |
More Details
Record type | Project |
Sector | Residential, Rail, Government |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
