logo
ProjectProposed

Alignment 14 of Rail Realignment Project

Proposed · California · Last reported Feb 2025

Source: NBC 7 San Diego

Alignment 14 is one of the proposed routes for the rail realignment project, which would take the train deeper into the Solana Beach trench and underneath the lagoon, avoiding residential areas. This alignment is estimated to cost between $7 billion and $9 billion.

Status
Prospective
Sector
Residential, Rail, Government
Location
Del Mar, California, United States of America
Updated
22 Jul 2026
Source
NBC 7 San Diego

ConstructChat

Ask ConstructChat about Alignment 14 of Rail Realignment Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Alignment 14 of Rail Realignment Project” is an infrastructure initiative in the Residential sector, located in Del Mar, California, United States. Taiyo aggregates data on it from NBC 7 San Diego.

Participants

Sponsoring Agency

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Alignment 14 is one of the proposed routes for the rail realignment project, which would take the train deeper into the Solana Beach trench and underneath the lagoon, avoiding residential areas. This alignment is estimated to cost between $7 billion and $9 billion.

Budget

Location

Country

United States of America (USA)

State

California

City

Del Mar

Source

Source

NBC 7 San Diego

URL

More Details

Record type

Project

Sector

Residential, Rail, Government

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project