logo

Alinta Fortescue Solar Gas Hybrid Project

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Current

The Alinta Fortescue Solar Gas Hybrid Project will be developed, owned and operated by Alinta. The facility consists of 60 MW AC solar PV integrated with a 35 MW battery storage facility at the Newman gas-fired power station in the Pilbara region of WA. The Alinta Fortescue Solar Gas Hybrid Project recognises that remote mine sites in the Pilbara are heavily reliant on diesel or gas generation for

Project Information FAQ

Project Information

5 Q
The project “Alinta Fortescue Solar Gas Hybrid Project” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Alinta Fortescue Solar Gas Hybrid Project will be developed, owned and operated by Alinta. The facility consists of 60 MW AC solar PV integrated with a 35 MW battery storage facility at the Newman gas-fired power station in the Pilbara region of WA. The Alinta Fortescue Solar Gas Hybrid Project recognises that remote mine sites in the Pilbara are heavily reliant on diesel or gas generation for their energy needs.To unlock further investment in renewable energy in the sector, more projects are needed to demonstrate how renewable energy solutions can provide secure and reliable electricity for major mining operations and help reduce emissions.The Alinta Fortescue Solar Gas Hybrid Project will aim to demonstrate that the mining operations can be reliably powered by 100 per cent renewable energy at certain times.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data