Aljo Gold Project Phase 2-2025 Drill Program
Sector: Mining • Location: Timmins, Ontario, Canada
Source: Lelezard
The Phase 2-2025 drill program at the Aljo Gold Project involved a 12-hole (2,650 metre) drilling campaign designed to confirm and expand key mineralized zones across the Main, Hangingwall, and Footwall corridors. The program successfully confirmed continuity, expanded mineralization at depth, and refined the geologic model, including the discovery of a new Footwall Zone (FW4).
- Status
- Under Construction
- Sector
- Mining
- Location
- Timmins, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Lelezard
ConstructChat
Ask ConstructChat about Aljo Gold Project Phase 2-2025 Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Phase 2-2025 drill program at the Aljo Gold Project involved a 12-hole (2,650 metre) drilling campaign designed to confirm and expand key mineralized zones across the Main, Hangingwall, and Footwall corridors. The program successfully confirmed continuity, expanded mineralization at depth, and refined the geologic model, including the discovery of a new Footwall Zone (FW4). |
Original sector | Mining |
Location
Country | Canada |
State | Ontario |
City | Timmins |
Source
Source | Lelezard |
URL |
More Details
Record type | Project |
Article published date | 2025-11-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
