logo

Allahabad division - Construction of Aligarh Flyover

Sector: Bridge • Location: Aligarh, Uttar Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information North Central Railway [NCR] - II has come up with Allahabad division - Construction of Aligarh Flyover with a ticket size of 1179.27 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project At Aligarh Jn. Station of Allahabad division a branch line Bareli [BE

Project Information FAQ

Project Information

5 Q
The project “Allahabad division - Construction of Aligarh Flyover” is an infrastructure initiative in the Bridge sector, located in Aligarh, Uttar Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information North Central Railway [NCR] - II has come up with Allahabad division - Construction of Aligarh Flyover with a ticket size of 1179.27 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project At Aligarh Jn. Station of Allahabad division a branch line Bareli [BE] - Aligarh [ALJN] terminates. There are two unit of thermal power plant at Harduaganj, being served by Harduaganj [HGJ] Rly station on this line. Two cement plants are also situated in this section. There is an expansion plan of Harduaganj power plant for which work is in progress. The trains coming from HWH side and going to HGJ/BE crosses DN main line of HWH-NDLS route, which is very busy and carrying more than 150percentage traffic than the line capacity. Due to above heavy traffic, there is no path available for surface crossing of loaded goods trains coming from HWH side and going to BE. This results into heavy detention of trains at ALJN as well as Harduaganj station. To smoothen the train operation and improvement of punctuality as well as Wagon turn round, this surface crossing is proposed to be eliminated by construction of flyover connecting ALJN to HGJ, which will also result into doubling of ALJN-HGJ section.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data