logo

Allain Duhangan Hydro Electric Project

Sector: Hydro • Location: India

Source: World Bank Group

Project
Active

The Allain Duhangan hydro electric project was a 192 MW run-of-river hydroelectric power plant, located on the Allain and Duhangan tributaries of the Beas River near Manali, Kullu District in the state of Himachal Pradesh. The project was being developed by Malana Power Company Limited (MPCL) which is owned by the LNJ Bhilwara (LNJ) Group.

MPCL had established Allain Duhangan Hydro Power Limit

Status
Prospective
Sector
Hydro, Road, Power Generation (CCGT), Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Allain Duhangan Hydro Electric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Allain Duhangan Hydro Electric Project” is an infrastructure initiative in the Hydro sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Allain Duhangan hydro electric project was a 192 MW run-of-river hydroelectric power plant, located on the Allain and Duhangan tributaries of the Beas River near Manali, Kullu District in the state of Himachal Pradesh. The project was being developed by Malana Power Company Limited (MPCL) which is owned by the LNJ Bhilwara (LNJ) Group. MPCL had established Allain Duhangan Hydro Power Limited (AD Hydro) for implementing the project. MPCL was a Joint Venture between the LNJ Bhilwara group, and SN Power Invest, a Norwegian firm. The Norwegian firm was an equal venture between Norway’s electricity company Statkraft and the state-funded risk capital investor Norfund. LNJ Bhilwara holds 51% equity in MPCL while SN Power Invest holds 49% equity in MPCL. MPCL in turn held 90% of the equity in AD Hydro and International Finance Corporation (IFC) held 10%. AD Hydro proposed to sell power through a combination of long term PPAs with states in the northern region of India and short term PPAs with Power Trading Corporation, a public-private partnership. The details of the final set of PPAs signed were not available at the time of collection of this information. The project was estimated to cost USD 230.58 million. The project was been funded through 65:35 debt equity ratio. IFC had committed around USD 49 million of equity and debt to the project in April 2005, with the debt component being approximately USD 42 million the equity being approximately USD 7 million. The debt funded by IFC had a maturity of 15 years. The rest of the funding had been tied up from Indian Banks and the project achieved financial closure in November 2006. The project was expected to be commissioned in June 2009. Commissioning was realized in April 2010.

Original sector

Energy

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Road, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project