Alley Reconstruction
Sector: Car parking • Location: Bellwood, Illinois, United States of America
Source: Dodge USA
Work on the Project shall consist of removing the existing hot-mix asphalt alley pavement, existing curb areas, sidewalks, and garage aprons, repair or replacement of existing storm sewer structures, installation of PVC storm sewer pipe, aggregate base course, concrete alley pavement, concrete curb and gutters, sidewalks, alley aprons, garage aprons, and landscape restoration.
- Status
- Closed
- Sector
- Car parking, Road, Cement, Waste Processing and Treatment, Water Supply and Storage, Automotive, Government, Commercial
- Location
- Bellwood, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Alley Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work on the Project shall consist of removing the existing hot-mix asphalt alley pavement, existing curb areas, sidewalks, and garage aprons, repair or replacement of existing storm sewer structures, installation of PVC storm sewer pipe, aggregate base course, concrete alley pavement, concrete curb and gutters, sidewalks, alley aprons, garage aprons, and landscape restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Bellwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Cement, Waste Processing and Treatment, Water Supply and Storage, Automotive, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
