logo

Alley Repair & Sanitary Sewer Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Project
Closed

DESCRIPTION OF MAJOR UNITS OF WORK: Pavement Removal 769 Sq. Yds. 8 Non-Reinforced Concrete Pavement 43 Sq. Yds. 7 Reinforced Concrete Pavement 707 Sq. Yds. Combined Curb and Gutter, Type II 62 Lin. Ft. Traffic Control LS Lump Sum 4 Ft. Dia. Standard Manhole, Type I (0 -6 ) 2 Each 8 Sanitary Sewer (PVCP) 508 Lin. Ft. Service (Wye) Connection, 4 20 Each 4 House Service Line (PVCP) 160 Lin. Ft.

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial
Location
Topeka, Kansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Alley Repair & Sanitary Sewer Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Alley Repair & Sanitary Sewer Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Topeka, Kansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

DESCRIPTION OF MAJOR UNITS OF WORK: Pavement Removal 769 Sq. Yds. 8 Non-Reinforced Concrete Pavement 43 Sq. Yds. 7 Reinforced Concrete Pavement 707 Sq. Yds. Combined Curb and Gutter, Type II 62 Lin. Ft. Traffic Control LS Lump Sum 4 Ft. Dia. Standard Manhole, Type I (0 -6 ) 2 Each 8 Sanitary Sewer (PVCP) 508 Lin. Ft. Service (Wye) Connection, 4 20 Each 4 House Service Line (PVCP) 160 Lin. Ft.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Topeka

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project