Alliance Brookhollow West - Two Warehouse Buildings
Sector: Cement • Location: Houston, Texas, United States of America
Source: Dodge
Two warehouse buildings totaling 185,428 square feet on 12.7 acres. 134,525 SF rear-load building with trailer parking. 50,903 SF rear-load building. Both will be divisible and have 32-foot clear heights; and 130-foot truck courts. Ingress/egress along Beltway 8, Brookriver Drive and Empire Central Drive.
- Status
- Prospective
- Sector
- Cement, Warehouse, Car parking, Manufacturing (Industrial), Commercial, Automotive
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Alliance Brookhollow West - Two Warehouse Buildings
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Two warehouse buildings totaling 185,428 square feet on 12.7 acres. 134,525 SF rear-load building with trailer parking. 50,903 SF rear-load building. Both will be divisible and have 32-foot clear heights; and 130-foot truck courts. Ingress/egress along Beltway 8, Brookriver Drive and Empire Central Drive. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Warehouse, Car parking, Manufacturing (Industrial), Commercial, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
