logo
ProjectUnder Construction

Alliant Energy LightLine Bridge Project

One of 10,000+ projects Taiyo tracks in Iowa.

Source: KGAN

The Alliant Energy LightLine bridge project is run by ConnectCR. It involves replacing the washed out railroad bridge destroyed in the 2008 flood. The bridge will provide visitors with a safe way to cross the Cedar River and connect the Newbo and Czech Village districts.

Status
Under Construction
Sector
Rail, Bridge
Location
Cedar Rapids, Iowa, United States of America
Updated
22 Jul 2026
Source
KGAN

ConstructChat

Ask ConstructChat about Alliant Energy LightLine Bridge Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Alliant Energy LightLine Bridge Project” is an infrastructure initiative in the Rail sector, located in Cedar Rapids, Iowa, United States. Taiyo aggregates data on it from KGAN.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Alliant Energy LightLine bridge project is run by ConnectCR. It involves replacing the washed out railroad bridge destroyed in the 2008 flood. The bridge will provide visitors with a safe way to cross the Cedar River and connect the Newbo and Czech Village districts.

Original sector

Infrastructure

Location

Country

United States of America (USA)

State

Iowa

City

Cedar Rapids

Source

Source

KGAN

URL

More Details

Record type

Project

Sector

Rail, Bridge

Article published date

2025-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project