Allison Dock & Mooring Buoys
Sector: Water Supply and Storage • Location: Manson, Washington, United States of America
Source: Dodge USA
construction and placement of a 596 sq ft single-use, year-round dock and the placement of two (2) mooring buoys. The dock would be constructed in a L shape and would consist of four (4) sections: a 4 ft x 40 ft gangway (7 ft of which would overhang the float extension for articulation), and a 8 ft x 35 ft float with a 5 ft x 5 ft float extension landward of the float (for gangway articulation dur
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial)
- Location
- Manson, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Allison Dock & Mooring Buoys
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction and placement of a 596 sq ft single-use, year-round dock and the placement of two (2) mooring buoys. The dock would be constructed in a L shape and would consist of four (4) sections: a 4 ft x 40 ft gangway (7 ft of which would overhang the float extension for articulation), and a 8 ft x 35 ft float with a 5 ft x 5 ft float extension landward of the float (for gangway articulation during low water). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Manson |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
