logo
ProjectPlanned

Allium Solar and Energy Storage System Project

One of 10,000+ projects Taiyo tracks in California.

Source: BenitoLink

The Allium Solar and Energy Storage System Project is a proposed 945-acre installation north of the Hollister Municipal Airport designed to generate 110 megawatts of solar power and includes a 15-acre Battery Energy Storage System (BESS) capable of storing 440 megawatt-hours, approximately eight hours of power discharging at 110 MW. The project aims to generate enough power for at least 60,000 hou

Status
Prospective
Sector
Solar, Government, Airport, Power Generation (CCGT), Road, Energy Storage
Location
Hollister, California, United States of America
Updated
22 Jul 2026
Source
BenitoLink

ConstructChat

Ask ConstructChat about Allium Solar and Energy Storage System Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Allium Solar and Energy Storage System Project” is an infrastructure initiative in the Solar sector, located in Hollister, California, United States. Taiyo aggregates data on it from BenitoLink.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Allium Solar and Energy Storage System Project is a proposed 945-acre installation north of the Hollister Municipal Airport designed to generate 110 megawatts of solar power and includes a 15-acre Battery Energy Storage System (BESS) capable of storing 440 megawatt-hours, approximately eight hours of power discharging at 110 MW. The project aims to generate enough power for at least 60,000 households and has a 40-year lifespan with plans for dismantling and land restoration after that period.

Original sector

Energy

Location

Country

United States of America (USA)

State

California

City

Hollister

Source

Source

BenitoLink

URL

More Details

Record type

Project

Sector

Solar, Government, Airport, Power Generation (CCGT), Road, Energy Storage

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project