Allsup's Convenience Store #102505 (Tucumcari, NM)
Sector: Power Transmission • Location: Tucumcari, New Mexico, United States of America
Source: Dodge USA
The project is the construction of a new convenience store and gas station. The facility includes a large sales area with checkout counter, stock/ utility area, restroom facilities, walk-in coolers, and office. The construction is a pre-engineered metal building provided by the owner and installed by the general contractor (including roof installation). The scope includes architectural, structural
- Status
- Closed
- Sector
- Power Transmission, Metal, Commercial, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Residential
- Location
- Tucumcari, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Allsup's Convenience Store #102505 (Tucumcari, NM)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the construction of a new convenience store and gas station. The facility includes a large sales area with checkout counter, stock/ utility area, restroom facilities, walk-in coolers, and office. The construction is a pre-engineered metal building provided by the owner and installed by the general contractor (including roof installation). The scope includes architectural, structural, mechanical, electrical, and plumbing (MEP). The exterior walls are light gauge metal studs with... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Tucumcari |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Metal, Commercial, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Residential |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
